Technical object under construction plan

Print Previous page Top page Next page

ic_0147 The technical plan of the object of construction in progress is prepared in accordance with the general requirements for the preparation of the technical plan.

Information about the object of construction in progress, with the exception of information about the location of such a property on the land plot and the degree of readiness of the object of construction in progress, are indicated in the technical plan on the basis of the cadastral works submitted by the customer for the construction permit for such an object and project documentation for such a real estate object, if its production is provided the legislation of the Russian Federation.

The technical plan of the construction in progress does not include the section «Information on the part (parts) of the real estate object».

Formation of the technical plan in the form of an electronic XML-document and in the form of a text report is performed in the «Technical plan» dialog. The initial initialization of the dialog content and the setting the type of real estate object is performed by information from the digital cadastral map, taking into account the selected mode of formation.

Elements for entering and editing data in the «Technical plan» dialog are arranged into groups, in accordance with the sections and details of the technical plan, and arranged according to screen pages (tabs):

 

Composition of the pages and elements on them may differ slightly for different types of real estate objects.

 

To automate the processing of cadastral and land management data, the preset settings for the codes of objects and attributes of the digital classifier of the survey map of the actual version are used.

Digital classifier survey of the actual version, containing the necessary composition of objects and attributes of the cadastral map, is included in the delivery of the program.